The solar + storage project has commenced construction at the Sterling project in Arizona
The project is located along a historic stretch of U.S. Route 66 between Topock and Kingman, where infrastructure once supporting westward expansion is now giving way to facilities designed to fuel the next phase of growth. To access the site, the company is constructing the Polaris Road, a 5.2-mile route connecting the historic Route 66 with solar and energy storage projects.
© Copyright: 2026 Xiamen Wintop New Energy Tech Co., Ltd.. All Rights Reserved.
IPv6 network supported